Modeling Time-Constraints in Construction Operations through Simulation

Auteur(s) / Author(s)

HONG ZHANG (1) ; HENG LI (2) ; MING LU (3) ;

Affiliation(s) du ou des auteurs / Author(s) Affiliation(s)

(1) School of Civil Engineering, Shenzhen Univ., Nanhai Ave 3688, Shenzhen, Guangdong, CHINE
(2) Dept. of Building and Real Estate, Hong Kong Polytechnic Univ, Hung Hom, Kowloon, HONG-KONG
(3) Dept. of Civil Engineering, Hong Kong Polytechnic Univ, Hung Hom, Kowloon, HONG-KONG

Résumé / Abstract

Construction operations often face time constraints that influence the execution of activities, which are not addressed enough when modeling through general discrete-event simulation. This paper describes a simulation-based methodology to handle the time constraints including the cyclical break, preemption, and overtime use. In consideration of the variable number of breaks or variable break duration for different activities, an algorithm to determine the execution of the time-constrained activities is proposed, in which the concepts of time cycle and time window are introduced. The proposed algorithm is incorporated with an activity scanning simulation strategy to develop a construction simulation for modeling the time-constrained construction operations. Some examples are presented to illustrate and validate the algorithm, and highlight the effectiveness of the developed construction simulation. The study provides an alternative to improve construction simulation in modeling of the time-constrained construction operations and is expected to assist researchers or practitioners at analyzing or planning construction operations.

Revue / Journal Title

Journal of construction engineering and management    ISSN  0733-9364   CODEN JCEMD4 

Source / Source

2008, vol. 134, no7, pp. 545-554 [10 page(s) (article)] (1/2 p.)

Langue / Language

Anglais

Editeur / Publisher

American Society of Civil Engineers, Reston, VA, ETATS-UNIS  (1983) (Revue)

Mots-clés anglais / English Keywords

Experimentation

;

Example

;

Implementation

;

Activity

;

Time

;

Stress analysis

;

Construction management

;

Simulation model

;

Modeling

;

Building site

;

Mots-clés français / French Keywords

Expérimentation

;

Exemple

;

Implémentation

;

Activité

;

Temps

;

Analyse contrainte

;

Contrôle travaux

;

Modèle simulation

;

Modélisation

;

Chantier construction

;

Mots-clés espagnols / Spanish Keywords

Experimentación

;

Ejemplo

;

Implementación

;

Actividad

;

Tiempo

;

Análisis tensión

;

Control trabajo

;

Modelo simulación

;

Modelización

;

Obra

;

Mots-clés d'auteur / Author Keywords

Construction management

;

Simulation

;

Time factors

;

Constraints

;

Localisation / Location

INIST-CNRS, Cote INIST : 572 P, 35400019622274.0100

Nº notice refdoc (ud4) : 20466752



Faire une nouvelle recherche
Make a new search
Lancer la recherche
Bas