Titre du document / Document title
Die Modernisierung des Heizkraftwerks Barmen : Erfahrungen bei der Umsetzung des Neubauprojektes und erste Betriebserfahrungen = The modernisation of the CHP plant barmen experiences during the conversion of these projects and first operational experiences
Auteur(s) / Author(s)
LEONHARD Volker
(1) ;
HERRMANN Uwe
(1) ;
Affiliation(s) du ou des auteurs / Author(s) Affiliation(s)
(1) Wuppertaler Stadtwerke AG, Wuppertal, ALLEMAGNE
Résumé / Abstract
The Wuppertaler Stadtwerke AG replaced at site CHP Plant Barmen an hard coal-fired block and also an combined-cycle gas turbine (CCGT) block by a modern CCGT plant. Under influence of the conditions of a liberally energy market and the Combined Heat and Power Generation Law (KWKG) the project examinations, preliminary planning, assignment and conversion of the modernisation measure were accomplished. The realisation of the project was made as an turn-key order by a general contractor. The new CCGT plant was integrated into an existing building and consists of two new gas turbines, each with one unfired heat recovery steam generator. From the old CCGT plant the existing extraction condensation turbine and also auxiliary plant units were integrated into the new plant. For the first time in Europe gas turbines of the type H 25 of the Japanese manufacturer Hitachi Ltd. were built into a power plant. A further new fact are the once through steam generators of the Canadian company Innovative Steam Technologies which are used for the first time in Germany. The special of this boilers is, that they are dry running during start-up and shut-down. Also these boilers can be run dry under gas turbine load. The operator describes the experiences with the conversion of these project and with commission and operation of the new CCGT plant were made. Particularly first experiences with the operation of the main components (HRSG, GT) of the plant.
Revue / Journal Title
VGB powertech
ISSN 1435-3199
Source / Source
2007, vol. 87, n
o4, [Note(s): 55-62 [7 p.]]
Langue / Language
Allemand
Editeur / Publisher
VGB PowerTech, Essen, ALLEMAGNE
(2001)
(Revue)
Mots-clés anglais / English Keywords
Europe ;
Once through boiler ;
Condensation turbine ;
Waste heat boiler ;
Heat recovery ;
Power law ;
Gas turbine ;
Germany ;
Coal power plant ;
Project ;
Combined power plant ;
Modernization ;
Mots-clés français / French Keywords
Europe ;
Chaudière passage unique ;
Turbine condensation ;
Chaudière récupération ;
Récupération chaleur ;
Loi puissance ;
Turbine gaz ;
Allemagne ;
Centrale charbon ;
Projet ;
Centrale combinée ;
Modernisation ;
Mots-clés espagnols / Spanish Keywords
Europa ;
Caldera paso único ;
Turbina condensación ;
Caldera recuperación ;
Recuperación calor ;
Ley poder ;
Turbina gas ;
Alemania ;
Central carbón ;
Proyecto ;
Central combinada ;
Modernización ;
Localisation / Location
INIST-CNRS, Cote INIST : 7739 A, 35400014574751.0060
Nº notice refdoc (ud4) : 18686767